Singapore sewerage: No space to waste
Source: New Civil Engineer
18 June, 2009 — The treatment of wastewater in Singapore steps into the future next week with the opening of phase one of a deep tunnel sewerage system and the Changi water reclamation plant.
The concept for Singapore’s deep tunnel sewerage system was first conceived in the late 1990s. At that time, Singapore had in place a comprehensive wastewater system, comprising over 3,000km of sewers and pumping mains, 100 pumping stations and six water reclamation plants serving the tiny 704km² island.
This project has involved 49 main contractors and consultants, with over 300 subcontractors and suppliers. A joint venture of consultants CH2M Hill and Parsons Brinckerhoff carried out a feasibility study of the deep tunnel sewerage system and designed the 48km long tunnels.
Please visit the New Civil Engineer to read the full article.
Visit www.ch2mhill.com.
